§ 01.08Roof replacement — TX + OH
One day on the roof. Twelve lines in writing.
Tear-off, not overlay. Twelve-line written spec on every contract. Balanced ventilation measured before the bid. We won't sign a contract without the soffit-and-ridge numbers on it.
Ten cells. The order we
run every replacement.
What actually happens between the contract and the warranty packet. Cell four is the pivot — once we’ve seen the deck, the crew chief calls you with what the moisture meter found before another shingle goes on.
- Day 0 · 070001/ 10
Materials staged.
Shingles, underlayment, ice barrier, drip edge, and dump trailer at the curb the day before. No "we forgot something" trip to the supply house.
- Day 1 · 073002/ 10
Tarps + plant cover.
Foundation tarps wall-to-eave, AC condenser covered, beds covered to the dripline. Anything we drop falls on tarp, not your tomatoes.
- Day 1 · 080003/ 10
Tear-off begins.
Old shingles, old underlayment, old flashings — all of it comes off. No layer left in place to hide rot underneath.
- Pivot · Decision04/ 10
Deck under-eyes.
Crew chief walks every elevation with a moisture meter; soft plywood is photographed and replaced before underlayment goes on.
- Day 1 · 110005/ 10
Ice barrier down.
Self-adhering rubberized membrane at every eave + every valley. In Ohio it runs further up the slope than the warm-wall.
- Day 1 · 130006/ 10
Synthetic underlayment.
Stays flat, stays sealed at the cap nail. Felt cups when wet and shrinks on a hot deck — we won’t install on it.
- Day 1 · 150007/ 10
Drip edge + starter.
Drip edge under the underlayment at the eave, over it at the rake. Starter strip with factory-applied sealant — not cut field shingles.
- Day 1–208/ 10
Field shingles.
Six nails per shingle (manufacturer high-wind nailing pattern), cap nails on every penetration, and a chalk-line every fourth course.
- Day 2 · 140009/ 10
Ridge cap + ventilation.
Ridge vent cut to manufacturer NFA, capped with hand-folded ridge shingles. Box vents balanced against soffit intake — measured, not guessed.
- Day 2 · 170010/ 10
Magnetic sweep + walk.
Three passes around the foundation with a wheeled magnet, gutters cleared, dump trailer hauled, walk-through with photos and warranty packet.
Five stations,
two weeks of warning,
one day of dust.
Most replacements run the same lane: an in-home estimate one week, a signed scope the next, materials and crew the week after. The roof itself is usually inside a single day.
- Week 1
In-home walk-through.
RA doesA senior estimator walks every elevation, photographs the deck through the attic, and writes the scope by hand on site.
You doForty-five minutes. Pull the cars out of the driveway and have an attic key handy.
- Week 2
Written scope + contract.
RA doesLine-by-line PDF: every material, ice barrier coverage, ventilation plan, deck-rot allowance, fixed price. We pull the permit.
You doRead it. Ask anything. Sign when the price and scope match what you heard at the kitchen table.
- Week 3
Schedule + materials staged.
RA doesMaterials arrive the day before, dump trailer staged at the curb the morning of, weather watched 72 hours out.
You doMove two cars off the driveway. Tell us where the patio furniture and grill are.
- 1 day on site
Install day.
RA doesTear-off, deck inspect, ice barrier, underlayment, drip edge, field shingles, ridge cap, ventilation, magnetic sweep. Most roofs finish before dinner.
You doStay if you want — you’ll see every layer go on. Or run errands; the dust stays outside.
- 48 hr after
Photo report + warranty.
RA doesDigital binder: every layer photographed, manufacturer warranty registered in your name, workmanship warranty signed.
You doPay the balance once you’ve walked the report. Roof is yours; warranty is on file.
The bid you sign
reads like this.
Twelve lines, every contract. Same in Frisco, same in Cleveland. When the storm-chaser bid comes back missing six of these, this is why ours costs more — and why ours is still on the house at year 22.
Two warranties.
Three ways to lose them.
Most warranty disputes happen because nobody told the homeowner what voids the paperwork. Here is the same matrix we walk through at the kitchen-table estimate — before you sign anything.
What the shingle maker covers.
GAF, Owens Corning, CertainTeed — registered in your name. * "Lifetime" = manufacturer’s lifetime, pro-rated after year 10.
- Material defect on the shingle itself — pro-rated after year 10.
- Algae streaking on most architectural lines for 10 years.
- Wind above the rated speed (most lines = 110 mph; Class 4 to 130 mph).
- Hail damage — that is what your homeowners policy is for, not the shingle warranty.
- Owner-supplied accessories (the box of underlayment from the big-box). Voids the system warranty.
What our install covers.
Signed at final walk. Transfers to the next owner once if the home sells — no transfer fee, no re-inspection.
- Any leak tied to our nail pattern, our flashings, our underlayment seal — first call, same week.
- Flashing failure at any wall, valley, or chimney we touched — for 25 years.
- Pipe-boot crack on any boot we installed — replaced free for the life of the warranty.
- Transferable once on resale — bumps the buyer’s home-inspection roof score.
- Acts of God — hail, tornado, fallen oak. Those ride your homeowners policy.
Mistakes we won’t let you make.
Three moves that void either the manufacturer warranty, ours, or both. We name them up front so they don’t come back at year 6.
- Mixed-brand systems. GAF shingle on Owens Corning underlayment voids both. We install everything from one system.
- Unbalanced ventilation. Adding a power vent later that fights the ridge vent voids the manufacturer warranty. We balance it once.
- Unauthorized repair. Random handyman patches the next storm — voids ours. Call us first; warranty stays alive.
- Pressure-washing. Strips the granule layer that protects the asphalt; manufacturer voids on contact.
- Mounting solar later? Tell us before. We’ll stage the rail-mount underlayment so the panel install doesn’t void either warranty.

§ 06Reach the dispatch desk
One day on the roof. Twelve lines in writing.
A senior estimator on the in-home walk. We measure the soffit and ridge net free area, walk the deck through the attic, and write the scope on site. Forty-five minutes. The warranty packet ships 48 hours after the final walk.